Customization: | Available |
---|---|
Warranty: | 24 Months |
Feature: | Precision |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
horizontal baling machine | ||||||||||
model | Motor power |
Bundle weight KG |
Work per hour | Conveyor size | Size of bundle |
Machine internal workingspace dimensions |
Hydraulic lever running length |
Machine size mm |
Machine weight | Length and width of feed port |
HH-100T | 18.5 | 300-500 | 4-7T | 7000*1200 | 1600*1100*800 | 3000*1100*800 | 2900 | 6820*1400*2000 | 5T | 1400*1100 |
HH-120T | 22 | 500-800 | 5-8T | 6T | ||||||
HH-160T | 30 | 1000-1200 | 6-9T | 7T | ||||||
HH-200T | 37 | 1200-1400 | 7-10T | 9000*1400 | 1800*1100*1250 | 3500*1100*1250 | 3500 | 9600*1400*2500 | 12T | 1700*1100 |
HH-250T | 45 | 1400-1800 | 10-15T | 9600*1400*2500 | 15T | 1700*1100 | ||||
Support customization Can be equipped with fully automatic device Special considerations: 1. After receiving the machine, please tear off the plastic wrap around the machine to dissipate heat when the machine is running. 2. After receiving the machine, check whether the screws of various parts of the machine are loose. If they are loose, please tighten them with the corresponding screwdriver to avoid malfunction of the machine under normal working conditions. 3. The power must be turned off when the machine is connected! 4. The machine motor cannot be operated when it runs in the opposite direction (according to the direction indicated by the arrow), and the motor is prohibited from running in a phase-missing state. 5. Maintenance is prohibited when the machine is running. 6. The machine is prohibited from running when the parts are worn or the screws of the parts are loose. 7. Please make sure that there are no people or obstacles around the machine before the machine is running to avoid injury or damage to the equipment. 8. The machine should regularly (5-7 days) clean the debris inside the compression chamber to avoid compression jams. 9. The oil temperature of the hydraulic system should be controlled within a certain range (under low temperature conditions, the oil temperature should reach above 20°C before sequential action is allowed; when the oil temperature is above 60°C, attention should be paid to the working condition of the system.) 10. On rainy days, be sure to take protective measures for the machine to avoid reducing the service life of the machine. |